LEGION 2 – Panel-Assembled System for Legionella Prevention
DESCRIPTION
The LEGION 2 panel is part of the LEGION line by STEIEL and has been designed for the constant and complete disinfection of the sanitary hot water circuits, for Legionella prevention.
It is suitable for dosing a biocide and a protective product of the hydraulic circuit proportionally to the flow rate of the water to be treated, by means of two specific multifunctional pumps.
The biocide dosing pump features self-bleeding head and reinforced diaphragm, resistant to chlorine dioxide or other oxidant.
The standard version is supplied with accessories to dose a biocide stored in hermetic drums; in case of product stored in normal tanks, order a suitable suction lance.
TECHNICAL DATA
- Panel 600 x 500 mm, with four holes for wall mounting
- The panel includes two multifunctional dosing pumps, mounted on brackets with rotating support
- Pump for biocide dosing, PSP161-PKTT/AS, featuring:
- “full PTFE” diaphragm and self-bleeding head
- Flow Control sensor, assembled on a special mounting support
- Injection valve and PTFE dosing hose
- Pump for filming product dosing, PSP161-PKT, featuring:
- Flow Control sensor directly assembled on the delivery valve
- Suction / injection / discharge hoses, injection valve, suction lance for 25/50 L tank
- Both pumps are equipped with an alarm relay, for dosing anomalies signalling
- Junction box with signal splitter, to command both pumps with just one volumetric water meter
- Two bottles for the correct disposal of the biocide
- On request, the pumps can be equipped with an RS485 serial port (as an alternative to the alarm relay)
DOWNLOAD THE DOCUMENTATION
LOGIN / REGISTER
To access to the download area
CONTACT US
To request more info about our products